Massive night last night (I’ll tell you about it next post). Very slow start this morning. Had to get into it. 7am the guys were here to plaster the kitchen. Raced to stay a ahead of them & get the insulation in before the sheets went down. Hardest bit was hanging the ceiling plaster, took 3 of us to hold long sheets in place while the screws went in. All done by 2pm. Crashed.
Plastering kitchen walls at the new venue – 23 Aug 2014.
Fires out.